WA Queue Project G0567 — Battery in Douglas, Washington

WA Queue Project G0567 — Battery in Douglas, Washington is a 5.0 MW battery interconnection project in Douglas, Washington with a current status of withdrawn. It is proposed to connect at Nilles Corner Substation.

5.0 MWCapacity
WithdrawnStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameWA Queue Project G0567 — Battery in Douglas, Washington
Queue IDG0567
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyBattery
Capacity5.0 MW
StateWashington
CountyDouglas
Point of interconnectionNilles Corner Substation
Requested (queue) date2017-06-19
Proposed in-service date2019-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.