WA Queue Project G0585 — Wind in KIickitat, Washington

WA Queue Project G0585 — Wind in KIickitat, Washington is a 313.0 MW wind interconnection project in KIickitat, Washington with a current status of active. It is proposed to connect at McNary-John Day 500kV Tap (BPA's "G0585 Substation").

313.0 MWCapacity
ActiveStatus
WAMarket
WindTechnology

Project facts

Canonical nameWA Queue Project G0585 — Wind in KIickitat, Washington
Queue IDG0585
Statusactive
Source statusSTUDY
MarketWA
TechnologyWind
Capacity313.0 MW
StateWashington
CountyKIickitat
Point of interconnectionMcNary-John Day 500kV Tap (BPA's "G0585 Substation")
Requested (queue) date2018-03-19
Proposed in-service date2021-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata