WA Queue Project G0608 — Battery in Klickitat, Washington

WA Queue Project G0608 — Battery in Klickitat, Washington is a 1,200.0 MW battery interconnection project in Klickitat, Washington with a current status of active. It is proposed to connect at BPA's John Day 500 kV Substation.

1,200.0 MWCapacity
ActiveStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameWA Queue Project G0608 — Battery in Klickitat, Washington
Queue IDG0608
Statusactive
Source statusSTUDY
MarketWA
TechnologyBattery
Capacity1,200.0 MW
StateWashington
CountyKlickitat
Point of interconnectionBPA's John Day 500 kV Substation
Requested (queue) date2018-12-07
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata