WA Queue Project G0686 — Solar in Benton, Washington

WA Queue Project G0686 — Solar in Benton, Washington is a 128.0 MW solar interconnection project in Benton, Washington with a current status of active. It is proposed to connect at Benton No 2 115 kV line..

128.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G0686 — Solar in Benton, Washington
Queue IDG0686
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity128.0 MW
StateWashington
CountyBenton
Point of interconnectionBenton No 2 115 kV line.
Requested (queue) date2021-08-13
Proposed in-service date2028-07-03
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.