WA Queue Project G0716 — Solar in Benton, Washington

WA Queue Project G0716 — Solar in Benton, Washington is a 100.0 MW solar interconnection project in Benton, Washington with a current status of active. It is proposed to connect at New 115 kV substation adjacent to the new Webber Canyon substation..

100.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G0716 — Solar in Benton, Washington
Queue IDG0716
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity100.0 MW
StateWashington
CountyBenton
Point of interconnectionNew 115 kV substation adjacent to the new Webber Canyon substation.
Requested (queue) date2021-12-02
Proposed in-service date2025-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.