WA Queue Project G0732 — Solar in Benton, Washington

WA Queue Project G0732 — Solar in Benton, Washington is a 200.0 MW solar interconnection project in Benton, Washington with a current status of withdrawn. It is proposed to connect at Wautoma 500 kV.

200.0 MWCapacity
WithdrawnStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G0732 — Solar in Benton, Washington
Queue IDG0732
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologySolar
Capacity200.0 MW
StateWashington
CountyBenton
Point of interconnectionWautoma 500 kV
Requested (queue) date2022-03-11
Proposed in-service date2027-04-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.