WA Queue Project G0814 — Wind in Grays Harbor, Washington

WA Queue Project G0814 — Wind in Grays Harbor, Washington is a 1,000.0 MW wind interconnection project in Grays Harbor, Washington with a current status of withdrawn. It is proposed to connect at Intalco Substation at 230 kV or alternate is Custer Substation at 500 kV.

1,000.0 MWCapacity
WithdrawnStatus
WAMarket
WindTechnology

Project facts

Canonical nameWA Queue Project G0814 — Wind in Grays Harbor, Washington
Queue IDG0814
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyWind
Capacity1,000.0 MW
StateWashington
CountyGrays Harbor
Point of interconnectionIntalco Substation at 230 kV or alternate is Custer Substation at 500 kV
Requested (queue) date2022-10-03
Proposed in-service date2030-05-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata