WA Queue Project G0816 — Wind in Grays Harbor, Washington

WA Queue Project G0816 — Wind in Grays Harbor, Washington is a 1,000.0 MW wind interconnection project in Grays Harbor, Washington with a current status of withdrawn. It is proposed to connect at Tacoma Substation at 500 kV.

1,000.0 MWCapacity
WithdrawnStatus
WAMarket
WindTechnology

Project facts

Canonical nameWA Queue Project G0816 — Wind in Grays Harbor, Washington
Queue IDG0816
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyWind
Capacity1,000.0 MW
StateWashington
CountyGrays Harbor
Point of interconnectionTacoma Substation at 500 kV
Requested (queue) date2022-10-03
Proposed in-service date2030-05-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.