WA Queue Project G0817 — Solar in Yakima, Washington is a 215.0 MW solar interconnection project in Yakima, Washington with a current status of withdrawn. It is proposed to connect at Spring Creek-Wine Country #1 between Spring Creek and Mabton Substation..

215.0 MWCapacity
WithdrawnStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G0817 — Solar in Yakima, Washington
Queue IDG0817
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologySolar
Capacity215.0 MW
StateWashington
CountyYakima
Point of interconnectionSpring Creek-Wine Country #1 between Spring Creek and Mabton Substation.
Requested (queue) date2022-10-03
Proposed in-service date2025-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata