WA Queue Project G0840 — Solar in Douglas, Washington

WA Queue Project G0840 — Solar in Douglas, Washington is a 300.0 MW solar interconnection project in Douglas, Washington with a current status of active. It is proposed to connect at Chief Joseph-Sickler No 1 500kV line.

300.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G0840 — Solar in Douglas, Washington
Queue IDG0840
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity300.0 MW
StateWashington
CountyDouglas
Point of interconnectionChief Joseph-Sickler No 1 500kV line
Requested (queue) date2023-02-07
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata