WA Queue Project G0858 — Battery in Douglas, Washington

WA Queue Project G0858 — Battery in Douglas, Washington is a 130.0 MW battery interconnection project in Douglas, Washington with a current status of active. It is proposed to connect at Columbia Substation @ 230kV.

130.0 MWCapacity
ActiveStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameWA Queue Project G0858 — Battery in Douglas, Washington
Queue IDG0858
Statusactive
Source statusSTUDY
MarketWA
TechnologyBattery
Capacity130.0 MW
StateWashington
CountyDouglas
Point of interconnectionColumbia Substation @ 230kV
Requested (queue) date2023-04-14
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata