WA Queue Project G0919 — Gas in Benton, Washington

WA Queue Project G0919 — Gas in Benton, Washington is a 220.0 MW gas interconnection project in Benton, Washington with a current status of active. It is proposed to connect at Ashe 500 kV Substation.

220.0 MWCapacity
ActiveStatus
WAMarket
GasTechnology

Project facts

Canonical nameWA Queue Project G0919 — Gas in Benton, Washington
Queue IDG0919
Statusactive
Source statusSTUDY
MarketWA
TechnologyGas
Capacity220.0 MW
StateWashington
CountyBenton
Point of interconnectionAshe 500 kV Substation
Requested (queue) date2023-08-24
Proposed in-service date2031-06-02
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.