WA Queue Project G0920 — Solar in Benton, Washington

WA Queue Project G0920 — Solar in Benton, Washington is a 500.0 MW solar interconnection project in Benton, Washington with a current status of active. It is proposed to connect at Ashe-Slatt No 1 500kV line.

500.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G0920 — Solar in Benton, Washington
Queue IDG0920
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity500.0 MW
StateWashington
CountyBenton
Point of interconnectionAshe-Slatt No 1 500kV line
Requested (queue) date2023-08-28
Proposed in-service date2027-01-06
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.