WA Queue Project G0925 — Wind in Walla Walla, Washington
WA Queue Project G0925 — Wind in Walla Walla, Washington is a 100.0 MW wind interconnection project in Walla Walla, Washington with a current status of active. It is proposed to connect at Lower Monumental – Little Goose No 1 500 kV line. Alternates: Lower Monumental – Little Goose No 2 500 kV line; Little Goose – Central Ferry No 2 500 kV line.
Project facts
| Canonical name | WA Queue Project G0925 — Wind in Walla Walla, Washington |
|---|---|
| Queue ID | G0925 |
| Status | active |
| Source status | STUDY |
| Market | WA |
| Technology | Wind |
| Capacity | 100.0 MW |
| State | Washington |
| County | Walla Walla |
| Point of interconnection | Lower Monumental – Little Goose No 1 500 kV line. Alternates: Lower Monumental – Little Goose No 2 500 kV line; Little Goose – Central Ferry No 2 500 kV line |
| Requested (queue) date | 2023-09-05 |
| Proposed in-service date | 2027-09-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata