WA Queue Project G0986 — Wind in Skagit, Washington

WA Queue Project G0986 — Wind in Skagit, Washington is a 150.0 MW wind interconnection project in Skagit, Washington with a current status of withdrawn. It is proposed to connect at Primary: Sedro-Woolley - Bellingham No 1 230kV line; Secondary: Murray - Custer No 1 230kV line..

150.0 MWCapacity
WithdrawnStatus
WAMarket
WindTechnology

Project facts

Canonical nameWA Queue Project G0986 — Wind in Skagit, Washington
Queue IDG0986
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyWind
Capacity150.0 MW
StateWashington
CountySkagit
Point of interconnectionPrimary: Sedro-Woolley - Bellingham No 1 230kV line; Secondary: Murray - Custer No 1 230kV line.
Requested (queue) date2023-11-03
Proposed in-service date2029-12-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata