WA Queue Project G0987 — Wind in Spokane, Washington

WA Queue Project G0987 — Wind in Spokane, Washington is a 200.0 MW wind interconnection project in Spokane, Washington with a current status of withdrawn. It is proposed to connect at Grand Coulee-Bell No 6 500 kV line.

200.0 MWCapacity
WithdrawnStatus
WAMarket
WindTechnology

Project facts

Canonical nameWA Queue Project G0987 — Wind in Spokane, Washington
Queue IDG0987
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyWind
Capacity200.0 MW
StateWashington
CountySpokane
Point of interconnectionGrand Coulee-Bell No 6 500 kV line
Requested (queue) date2023-11-06
Proposed in-service date2028-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata