WA Queue Project G1001 — Solar in Grant, Washington

WA Queue Project G1001 — Solar in Grant, Washington is a 150.0 MW solar interconnection project in Grant, Washington with a current status of active. It is proposed to connect at Potholes - Grand Coulee No 1 230kV line..

150.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G1001 — Solar in Grant, Washington
Queue IDG1001
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity150.0 MW
StateWashington
CountyGrant
Point of interconnectionPotholes - Grand Coulee No 1 230kV line.
Requested (queue) date2023-11-16
Proposed in-service date2029-12-03
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.