WA Queue Project G1003 — Solar in Adams, Washington

WA Queue Project G1003 — Solar in Adams, Washington is a 3.0 MW solar interconnection project in Adams, Washington with a current status of active. It is proposed to connect at Hatton tap to Connell tap to Benton-Scooteney No 1 115kV line.

3.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G1003 — Solar in Adams, Washington
Queue IDG1003
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity3.0 MW
StateWashington
CountyAdams
Point of interconnectionHatton tap to Connell tap to Benton-Scooteney No 1 115kV line
Requested (queue) date2023-11-16
Proposed in-service date2025-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata