WA Queue Project G1010 — Solar in Yakima, Washington

WA Queue Project G1010 — Solar in Yakima, Washington is a 70.0 MW solar interconnection project in Yakima, Washington with a current status of withdrawn. It is proposed to connect at Alfalfa Substation at 230kV.

70.0 MWCapacity
WithdrawnStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G1010 — Solar in Yakima, Washington
Queue IDG1010
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologySolar
Capacity70.0 MW
StateWashington
CountyYakima
Point of interconnectionAlfalfa Substation at 230kV
Requested (queue) date2023-11-20
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.