WA Queue Project G1043 — Battery in Grant, Washington

WA Queue Project G1043 — Battery in Grant, Washington is a 150.0 MW battery interconnection project in Grant, Washington with a current status of withdrawn. It is proposed to connect at On the Rocky Ford-Coulee 230kV transmission line approximately 21 miles northeast of Rocky Ford substation..

150.0 MWCapacity
WithdrawnStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameWA Queue Project G1043 — Battery in Grant, Washington
Queue IDG1043
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyBattery
Capacity150.0 MW
StateWashington
CountyGrant
Point of interconnectionOn the Rocky Ford-Coulee 230kV transmission line approximately 21 miles northeast of Rocky Ford substation.
Requested (queue) date2023-11-21
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata