WA Queue Project G1048 — Solar in Mason, Washington

WA Queue Project G1048 — Solar in Mason, Washington is a 200.0 MW solar interconnection project in Mason, Washington with a current status of active. It is proposed to connect at Shelton-Fairmont No 4 230 kV line.

200.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G1048 — Solar in Mason, Washington
Queue IDG1048
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity200.0 MW
StateWashington
CountyMason
Point of interconnectionShelton-Fairmont No 4 230 kV line
Requested (queue) date2023-11-22
Proposed in-service date2027-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.