WA Queue Project G1058 — Battery in Clark, Washington is a 20.0 MW battery interconnection project in Clark, Washington with a current status of active. It is proposed to connect at Sifton Substation at 115 kV.

20.0 MWCapacity
ActiveStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameWA Queue Project G1058 — Battery in Clark, Washington
Queue IDG1058
Statusactive
Source statusSTUDY
MarketWA
TechnologyBattery
Capacity20.0 MW
StateWashington
CountyClark
Point of interconnectionSifton Substation at 115 kV
Requested (queue) date2023-12-13
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata