WA Queue Project G1068 — Solar in Clark, Washington

WA Queue Project G1068 — Solar in Clark, Washington is a 1.0 MW solar interconnection project in Clark, Washington with a current status of active. It is proposed to connect at Sifton 115kV Substation.

1.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G1068 — Solar in Clark, Washington
Queue IDG1068
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity1.0 MW
StateWashington
CountyClark
Point of interconnectionSifton 115kV Substation
Requested (queue) date2024-06-21
Proposed in-service date2024-11-07
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata