WA Queue Project G1086 — Solar in Columbia & Garfield, Washington

WA Queue Project G1086 — Solar in Columbia & Garfield, Washington is a 359.3 MW solar interconnection project in Columbia & Garfield, Washington with a current status of active. It is proposed to connect at Central Ferry Substation.

359.3 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G1086 — Solar in Columbia & Garfield, Washington
Queue IDG1086
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity359.3 MW
StateWashington
CountyColumbia & Garfield
Point of interconnectionCentral Ferry Substation
Requested (queue) date2025-08-29
Proposed in-service date2029-06-29
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata