WA Queue Project G1090 — Solar in Pierce, Washington

WA Queue Project G1090 — Solar in Pierce, Washington is a 1.0 MW solar interconnection project in Pierce, Washington with a current status of active. It is proposed to connect at Peninsula Light’s Purdy Substation 13605 Goodnough Dr. NW, Gig Harbor, WA 98332.

1.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G1090 — Solar in Pierce, Washington
Queue IDG1090
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity1.0 MW
StateWashington
CountyPierce
Point of interconnectionPeninsula Light’s Purdy Substation 13605 Goodnough Dr. NW, Gig Harbor, WA 98332
Requested (queue) date2026-02-05
Proposed in-service date2026-01-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata