WA Queue Project G1092 — Solar in Benton, Washington

WA Queue Project G1092 — Solar in Benton, Washington is a 13.2 MW solar interconnection project in Benton, Washington with a current status of active. It is proposed to connect at White Bluffs-Richland No 1 115kV line. At the City of Richland’s Sandhill Crane Substation connected at 12.5kV. Sandhill Crane is connected to BPA’s transmission system via the White Bluffs-Richland No 1 115kV line..

13.2 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project G1092 — Solar in Benton, Washington
Queue IDG1092
Statusactive
Source statusSTUDY
MarketWA
TechnologySolar
Capacity13.2 MW
StateWashington
CountyBenton
Point of interconnectionWhite Bluffs-Richland No 1 115kV line. At the City of Richland’s Sandhill Crane Substation connected at 12.5kV. Sandhill Crane is connected to BPA’s transmission system via the White Bluffs-Richland No 1 115kV line.
Requested (queue) date2026-02-13
Proposed in-service date2027-01-29
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata