WA Queue Project G2021-01 — Other in Pierce, Washington
WA Queue Project G2021-01 — Other in Pierce, Washington is a 214.5 MW other interconnection project in Pierce, Washington with a current status of withdrawn. It is proposed to connect at Tide Flats Substation.
214.5 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | WA Queue Project G2021-01 — Other in Pierce, Washington |
|---|---|
| Queue ID | G2021-01 |
| Status | withdrawn |
| Source status | — |
| Market | WA |
| Technology | Other |
| Capacity | 214.5 MW |
| State | Washington |
| County | Pierce |
| Point of interconnection | Tide Flats Substation |
| Requested (queue) date | 2021-08-23 |
| Proposed in-service date | 2023-08-12 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | City of Tacoma - (WA) |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: tacoma-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.