WA Queue Project G2021-01 — Other in Pierce, Washington is a 214.5 MW other interconnection project in Pierce, Washington with a current status of withdrawn. It is proposed to connect at Tide Flats Substation.

214.5 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameWA Queue Project G2021-01 — Other in Pierce, Washington
Queue IDG2021-01
Statuswithdrawn
Source status
MarketWA
TechnologyOther
Capacity214.5 MW
StateWashington
CountyPierce
Point of interconnectionTide Flats Substation
Requested (queue) date2021-08-23
Proposed in-service date2023-08-12
Operational date
Withdrawn date
Developer
Utility / transmission ownerCity of Tacoma - (WA)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: tacoma-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata