WA Queue Project G49 — Wind in Benton, Washington is a 249.0 MW wind interconnection project in Benton, Washington with a current status of withdrawn. It is proposed to connect at 230 kV Big Eddy-Midway/ 500 kV Hanford-John Day line.

249.0 MWCapacity
WithdrawnStatus
WAMarket
WindTechnology

Project facts

Canonical nameWA Queue Project G49 — Wind in Benton, Washington
Queue IDG49
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyWind
Capacity249.0 MW
StateWashington
CountyBenton
Point of interconnection230 kV Big Eddy-Midway/ 500 kV Hanford-John Day line
Requested (queue) date2001-04-23
Proposed in-service date2002-11-30
Operational date
Withdrawn date
DeveloperWashington Winds, Inc.
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata