WA Queue Project Q59 — Solar+Battery in Adams, Washington

WA Queue Project Q59 — Solar+Battery in Adams, Washington is a 60.0 MW solar+battery interconnection project in Adams, Washington with a current status of suspended. It is proposed to connect at Roxboro 115kV Station.

60.0 MWCapacity
SuspendedStatus
WAMarket
Solar+BatteryTechnology

Project facts

Canonical nameWA Queue Project Q59 — Solar+Battery in Adams, Washington
Queue IDQ59
Statussuspended
Source statusSuspended
MarketWA
TechnologySolar+Battery
Capacity60.0 MW
StateWashington
CountyAdams
Point of interconnectionRoxboro 115kV Station
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectsuspendedhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata