WA Queue Project TCS-06 — Solar in Adams, Washington

WA Queue Project TCS-06 — Solar in Adams, Washington is a 84.0 MW solar interconnection project in Adams, Washington with a current status of withdrawn. It is proposed to connect at Lind-Shawnee 115kv line.

84.0 MWCapacity
WithdrawnStatus
WAMarket
SolarTechnology

Project facts

Canonical nameWA Queue Project TCS-06 — Solar in Adams, Washington
Queue IDTCS-06
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologySolar
Capacity84.0 MW
StateWashington
CountyAdams
Point of interconnectionLind-Shawnee 115kv line
Requested (queue) date2018-12-18
Proposed in-service date2020-06-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata