WA Queue Project TCS-08 — Solar+Battery in Franklin, Washington

WA Queue Project TCS-08 — Solar+Battery in Franklin, Washington is a 200.0 MW solar+battery interconnection project in Franklin, Washington with a current status of withdrawn. It is proposed to connect at Saddle Mt-Walla Walla 230kV line.

200.0 MWCapacity
WithdrawnStatus
WAMarket
Solar+BatteryTechnology

Project facts

Canonical nameWA Queue Project TCS-08 — Solar+Battery in Franklin, Washington
Queue IDTCS-08
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologySolar+Battery
Capacity200.0 MW
StateWashington
CountyFranklin
Point of interconnectionSaddle Mt-Walla Walla 230kV line
Requested (queue) date2019-09-06
Proposed in-service date2021-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.