Wallkill Energy (0067)

Wallkill Energy is a 1,080.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Coop Corn-Rock Tav Lines.

1,080.0 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameWallkill Energy
Queue ID0067
Statuswithdrawn
Source status0
Market
TechnologyGeneration
Capacity1,080.0 MW
StateNew York
County
Point of interconnectionCoop Corn-Rock Tav Lines
Requested (queue) date2000-06-21
Proposed in-service date
Operational date
Withdrawn date
DeveloperTitan Development, LLC
Utility / transmission ownerNYPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.