Wallula 500kV is a 500.0 MW other interconnection project in Walla Walla, Washington with a current status of withdrawn. It is proposed to connect at Lower Monumental-McNary 500kV line.

500.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameWallula 500kV
Queue IDL0426
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity500.0 MW
StateWashington
CountyWalla Walla
Point of interconnectionLower Monumental-McNary 500kV line
Requested (queue) date2017-12-07
Proposed in-service date2020-12-07
Operational date
Withdrawn date
DeveloperColumbia Rural Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata