Walter Bouldin Dam (4_2)

Walter Bouldin Dam is a 75.0 MW other interconnection project in Elmore, Alabama with a current status of operational.

75.0 MWCapacity
OperationalStatus
SOCOMarket
OtherTechnology

Project facts

Canonical nameWalter Bouldin Dam
Queue ID4_2
Statusoperational
Source status(OP) Operating
MarketSOCO
TechnologyOther
Capacity75.0 MW
StateAlabama
CountyElmore
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1967-08-01
Withdrawn date—
Developer—
Utility / transmission ownerAlabama Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata