Warner Lambert (54604_5164)

Warner Lambert is a 3.0 MW gas interconnection project in Washtenaw, Michigan with a current status of operational.

3.0 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameWarner Lambert
Queue ID54604_5164
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyGas
Capacity3.0 MW
StateMichigan
CountyWashtenaw
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1989-08-01
Withdrawn date
Developer
Utility / transmission ownerUniversity of Michigan NCampus Research

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata