Waterford 1&2 230 kV Substation (J1079)

Waterford 1&2 230 kV Substation is a 200.0 MW solar interconnection project in St. Charles Parish, Louisiana with a current status of withdrawn. It is proposed to connect at Waterford 1&2 230 kV Substation.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameWaterford 1&2 230 kV Substation
Queue IDJ1079
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateLouisiana
CountySt. Charles Parish
Point of interconnectionWaterford 1&2 230 kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2021-09-15
Operational date2021-09-15
Withdrawn date2019-08-29
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata