Waterman 120kV Substation (J1262)

Waterman 120kV Substation is a 25.0 MW gas interconnection project in Wayne County, Michigan with a current status of operational. It is proposed to connect at Waterman 120kV Substation.

25.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameWaterman 120kV Substation
Queue IDJ1262
Statusoperational
Source statusDone
Market
TechnologyGas
Capacity25.0 MW
StateMichigan
CountyWayne County
Point of interconnectionWaterman 120kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2019-06-01
Operational date2019-06-01
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata