Wautoma 138kV Switchyard (J1002)

Wautoma 138kV Switchyard is a 99.0 MW solar interconnection project in Waushara County, Wisconsin with a current status of operational. It is proposed to connect at Wautoma 138kV Switchyard.

99.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameWautoma 138kV Switchyard
Queue IDJ1002
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity99.0 MW
StateWisconsin
CountyWaushara County
Point of interconnectionWautoma 138kV Switchyard
Requested (queue) date2018-03-12
Proposed in-service date2021-10-01
Operational date2021-10-01
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.