Waverly Municipal Electric North Plant is a 3.5 MW gas interconnection project in Bremer, Iowa with a current status of operational.

3.5 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameWaverly Municipal Electric North Plant
Queue ID6554_7
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyGas
Capacity3.5 MW
StateIowa
CountyBremer
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1958-08-01
Withdrawn date
Developer
Utility / transmission ownerWaverly Municipal Elec Utility - (IA)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.