Webre 500 kV Substation (J1073)

Webre 500 kV Substation is a 300.0 MW solar interconnection project in Iberville Parish, Louisiana with a current status of withdrawn. It is proposed to connect at Webre 500 kV Substation.

300.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameWebre 500 kV Substation
Queue IDJ1073
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity300.0 MW
StateLouisiana
CountyIberville Parish
Point of interconnectionWebre 500 kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2021-09-15
Operational date2021-09-15
Withdrawn date2019-08-29
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata