Webster BESS (0948)

Webster BESS is a 8.8 MW battery interconnection project in Monroe, New York with a current status of withdrawn. It is proposed to connect at 34.5 kV.

8.8 MWCapacity
WithdrawnStatus
BMarket
BatteryTechnology

Project facts

Canonical nameWebster BESS
Queue ID0948
Statuswithdrawn
Source status0
MarketB
TechnologyBattery
Capacity8.8 MW
StateNew York
CountyMonroe
Point of interconnection34.5 kV
Requested (queue) date2019-11-18
Proposed in-service date2020-05-31
Operational date
Withdrawn date
DeveloperDimension NY 1 LLC
Utility / transmission ownerRG&E

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata