WED Coventry 3 (59305_WEDC3)

WED Coventry 3 is a 1.5 MW wind interconnection project in Kent, Rhode Island with a current status of operational.

1.5 MWCapacity
OperationalStatus
ISNEMarket
WindTechnology

Project facts

Canonical nameWED Coventry 3
Queue ID59305_WEDC3
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyWind
Capacity1.5 MW
StateRhode Island
CountyKent
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2016-08-01
Withdrawn date—
Developer—
Utility / transmission ownerWED Coventry Three, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata