Weissport 69kV (R06)

Weissport 69kV is a 60.0 MW wind interconnection project in Carbon, Pennsylvania with a current status of withdrawn.

60.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameWeissport 69kV
Queue IDR06
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity60.0 MW
StatePennsylvania
CountyCarbon
Point of interconnection—
Requested (queue) date2006-09-08
Proposed in-service date2008-12-31
Operational date—
Withdrawn date2007-04-03
Developer—
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata