Werber W - Hiway 22 345 kV line (J1567)

Werber W - Hiway 22 345 kV line is a 150.0 MW solar interconnection project in Outagamie, Wisconsin with a current status of withdrawn. It is proposed to connect at Werber W - Hiway 22 345 kV line.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameWerber W - Hiway 22 345 kV line
Queue IDJ1567
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateWisconsin
CountyOutagamie
Point of interconnectionWerber W - Hiway 22 345 kV line
Requested (queue) date2022-02-22
Proposed in-service date2023-10-01
Operational date2023-10-01
Withdrawn date2023-06-22
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata