Werner West (J2326)

Werner West is a 150.0 MW battery interconnection project in Outagamie, Wisconsin with a current status of withdrawn. It is proposed to connect at Werner West.

150.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameWerner West
Queue IDJ2326
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity150.0 MW
StateWisconsin
CountyOutagamie
Point of interconnectionWerner West
Requested (queue) date2022-09-13
Proposed in-service date2025-10-28
Operational date2025-10-28
Withdrawn date2026-10-20
Developer—
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-05withdrawn_date—2026-10-20high
2026-11-05statusoperationalwithdrawnhigh
2026-10-31phasePhase 2Phase 3low
2026-10-14phasePhase 1Phase 2low
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.