Werner West - Rocky Run 345kV (J1936)

Werner West - Rocky Run 345kV is a 75.0 MW battery interconnection project in Portage, Wisconsin with a current status of withdrawn. It is proposed to connect at Werner West - Rocky Run 345kV.

75.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameWerner West - Rocky Run 345kV
Queue IDJ1936
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity75.0 MW
StateWisconsin
CountyPortage
Point of interconnectionWerner West - Rocky Run 345kV
Requested (queue) date2021-11-29
Proposed in-service date2026-10-01
Operational date2026-10-01
Withdrawn date2023-06-05
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.