West Queue Project 10 — Wind in Idaho, Idaho

West Queue Project 10 — Wind in Idaho, Idaho is a 100.0 MW wind interconnection project in Idaho, Idaho with a current status of withdrawn. It is proposed to connect at Grangeville-Nez Perce 115 kV line near Grangeville.

100.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameWest Queue Project 10 — Wind in Idaho, Idaho
Queue ID10
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity100.0 MW
StateIdaho
CountyIdaho
Point of interconnectionGrangeville-Nez Perce 115 kV line near Grangeville
Requested (queue) date2007-12-24
Proposed in-service date2010-12-01
Operational date
Withdrawn date2008-06-24
Developer
Utility / transmission ownerAvista Utilities

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata