West Queue Project 105 — Solar+Battery in Greenlee, Arizona

West Queue Project 105 — Solar+Battery in Greenlee, Arizona is a 1,000.0 MW solar+battery interconnection project in Greenlee, Arizona with a current status of withdrawn. It is proposed to connect at Greenlee-Winchester 345kV Transmission Line.

1,000.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 105 — Solar+Battery in Greenlee, Arizona
Queue ID105
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity1,000.0 MW
StateArizona
CountyGreenlee
Point of interconnectionGreenlee-Winchester 345kV Transmission Line
Requested (queue) date2021-12-03
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerTucson Electric Power Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata