West Queue Project 1071 — Solar+Battery in Yakima, Washington

West Queue Project 1071 — Solar+Battery in Yakima, Washington is a 3.0 MW solar+battery interconnection project in Yakima, Washington with a current status of withdrawn. It is proposed to connect at Circuit 5Y312 out of Sunnyside substation.

3.0 MWCapacity
WithdrawnStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameWest Queue Project 1071 — Solar+Battery in Yakima, Washington
Queue ID1071
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar+Battery
Capacity3.0 MW
StateWashington
CountyYakima
Point of interconnectionCircuit 5Y312 out of Sunnyside substation
Requested (queue) date2018-10-05
Proposed in-service date2020-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.