West Queue Project 110 — Solar+Wind+Battery in Garfield, Washington
West Queue Project 110 — Solar+Wind+Battery in Garfield, Washington is a 100.0 MW solar+wind+battery interconnection project in Garfield, Washington with a current status of active. It is proposed to connect at DryCreek 230 kV or Walla Walla to Dry Creek 230 kV.
Project facts
| Canonical name | West Queue Project 110 — Solar+Wind+Battery in Garfield, Washington |
|---|---|
| Queue ID | 110 |
| Status | active |
| Source status | active |
| Market | West |
| Technology | Solar+Wind+Battery |
| Capacity | 100.0 MW |
| State | Washington |
| County | Garfield |
| Point of interconnection | DryCreek 230 kV or Walla Walla to Dry Creek 230 kV |
| Requested (queue) date | 2021-01-07 |
| Proposed in-service date | 2025-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Avista Utilities |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata